Skip to content
Solved Assignments

BUS 517: Project Management - Week 11 Final Exam

Final Exam for Project Management covering key concepts from Week 11.

Preview 2 of 6 pages

See the first 2 pages exactly as they appear in the document.

  1. Page 1
    Read page 1 as text

    BUS 517: Project Management - Week 11 Final Exam BUS 517 WK 11 Final Exam 1. Information to develop a project network is collected from the A. Organization breakdown structure B. Work breakdown structure C. Budget D. Project proposal E. Responsibility matrix 2. Which of the following represents an activity on an AON project network? A. An arrow B. A line C. A node D. Both A and B are correct E. A, B, and C are all correct 3. Arrows on an AON project network represent: A. An activity B. Project flow C. Dependency D. Both B and C are correct E. Both A and B are correct 4. When translated into a project network, a work package will become A. A single activity B. One or more activities C. A milestone D. A critical path E. An arrow 5. Which of the following is provided by a project network but not by the work breakdown structure? A. Dependencies B. Sequencing C. Interrelationships D. Both A and B are correct E. A, B, and C are all correct 6. On a project network, the activity times are derived from the A. Organization breakdown structure B. Work packages C. Budget D. Project proposal E. Responsibility matrix 7. Part of a project is to Develop Product Specifications . This is best classified as a(n) A. Event B. Path C. Activity

  2. Page 2

4 more pages in the full document

Unlock it once and it stays in your library, ready to chat with or turn into flashcards.

Unlock the full document
See all

Study this document with CramX

Once it is in your library, every tool can work from it.