Construction CDT Exam With Answers (175 Solved Questions)
Get exam-ready with Construction CDT Exam With Answers, featuring authentic past exam papers with detailed solutions.
Anna Wilson
Contributor
4.4
34
7 months ago
Preview (16 of 54 Pages)
100%
Purchase to unlock
Page 1
Loading page ...
CDT Exam questionsSelect the entity which is generally assigned the following duties and responsibilities bythe Conditions of the Contract: Protection of job site workers and stored materials.A-Architect/EngineerB-OwnerC-ContractorD-Varies, as stated in the Supplementary ConditionsE-None of the aboveReference: PDPG 5.4.1.7 and PDPG 15.12.11; EJCDC C-700 Paras. 7.12 through7.15; AIA A201 Sections 10.1, 10.2, and 10.4. Also see CCAPG 6.8; CCPG 9.14.Answer: C-Contractor. Safetyprovisions in both EJCDC and AIA documents clearlymake safety and protection of persons and property at the construction Site the soleresponsibility of the Contractor.Select the entity which is generally assigned the following duties and responsibilities bythe Conditions of the Contract: Resolution of claims.A-OwnerB-ContractorC-Varies, as stated in the Supplementary ConditionsD-Initial Decision MakerReference: PDPG 15.15.3; AIA A201 Sections 1.1.8 and 15.2. Also see CCAPGChapter 10 (particularly CCAPG 10.3)Answer: D-Initial Decision Maker. The Initial Decision Maker is an entity that existsonly in AIA documents and is not used in EJCDC documents. In AIA documents, whenan entity other than the Architect is named as the Initial Decision Maker, said entity isidentified in AIA A101 (Owner-Contractor Agreement) Section 6.1. In actual practicewith AIA documents, the Initial Decision Maker is typically the Architect, but may be athird party considered to be neutral.select the entity which is generally assigned the following duties and responsibilities bythe Conditions of the Contract: Paying taxes for the Work.A-Architect/EngineerB-OwnerC-ContractorD-Varies, as stated in the Supplementary ConditionsE-None of the aboveReference: EJCDC C-700 Para. 7.09; AIA A201 Section 3.6; PDPG 13.6.4.4 amongothers. Also see CCAPG 3.1.4.Answer: C-Contractor. Taxes are part of the cost of construction for which theContractor is responsible under the terms of the Contract Documents.
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Preview Mode
This document has 54 pages. Sign in to access the full document!