Skip to content
Solved Assignments

ACC 349 Final Exam: Managerial and Cost Accounting Concepts

Final exam on managerial and cost accounting principles.

Preview 3 of 9 pages

See the first 3 pages exactly as they appear in the document.

  1. Page 1
    Read page 1 as text

    ACC 349 Final Exam: Managerial and Cost Accounting Concepts ACC 349 Final Exam 1) What is the best way to handle manufacturing overhead costs in order to get the most timely job cost information? A. The company should add actual manufacturing overhead costs to jobs as soon as the overhead costs are incurred. B. The company should determine an allocation rate as soon as the actual costs are known, and then apply manufacturing overhead to jobs. C. The company should account for only the direct production costs. D. The company should apply overhead using an estimated rate throughout the year. 2) At the end of the year, manufacturing overhead has been overapplied. What occurred to create this situation? A. The company incurred more manufacturing overhead costs than the manufacturing overhead assigned to jobs. B. The actual manufacturing overhead costs were less than the manufacturing overhead assigned to jobs. C. The company incurred more total job costs than the amount budgeted for the job. D. Estimated manufacturing overhead was less than actual manufacturing overhead costs. 3) Luca Company overapplied manufacturing overhead during 2006. Which one of the following is part of the year end entry to dispose of the overapplied amount assuming the amount is material? A. A decrease to work in process inventory B. A decrease to applied overhead C. An increase to finished goods D. An increase to cost of goods sold 4) Which of the following would be accounted for using a job order cost system? A. The production of textbooks B. The production of town homes C. The pasteurization of milk D. The production of cans of spinach 5) Which one of the following is NEVER part of recording the issuance of raw materials in a job order cost system? A. Debit Manufacturing Overhead B. Debit Finished Goods Inventory C. Debit Work in Process Inventory D. Credit Raw Materials Inventory 6) What is unique about the flow of costs in a job order cost system? A. It involves accumulating material, labor, and manufacturing overhead costs as they are incurred in order to determine the job cost.

  2. Page 2
  3. Page 3
    Read page 3 as text

    B. Each job is costed separately in a Work in Process subsidiary ledger. C. Job costs cannot be measured until all overhead costs are determined. D. There are no costs remaining in Work in Process at year end. 7) Which one of the following costs would be included in manufacturing overhead of a lawn mower manufacturer? A. The cost of the fuel lines that run from the motor to the gas tank B. The cost of the wheels C. Depreciation on the testing equipment D. The wages earned by motor assemblers 8) What broad functions do the management of an organization perform? A. Planning, directing, and controlling B. Directing, manufacturing, and controlling C. Planning, directing, and selling D. Planning, manufacturing, and controlling 9) Which of the following represents the correct order in which inventories are reported on a manufacturer’s balance sheet? A. Work in process, finished goods raw materials B. Raw materials, work in process, finished goods C. Finished goods, work in process, raw materials D. Work in process, raw materials, finished goods 10) In traditional costing systems, overhead is generally applied based on A. machine hours B. direct labor C. direct material dollars D. units of production 11) An activity that has a direct cause - effect relationship with the resources consumed is a(n) A. overhead rate B. product activity C. cost driver D. cost pool 12) A well - designed activity - based costing system starts with A. computing the activity - based overhead rate B. analyzing the activities performed to manufacture a product C. identifying the activity - cost pools D. assigning manufacturing overhead costs for each activity cost pool to products 13) Which of the following factors would suggest a switch to activity - based costing? A. Overhead costs constitute a significant portion of total costs. B. Production managers use data provided by the existing system. C. Product lines similar in volume and manufacturing complexity. D. The manufacturing process has been stable.

6 more pages in the full document

Unlock it once and it stays in your library, ready to chat with or turn into flashcards.

Unlock the full document
See all

Study this document with CramX

Once it is in your library, every tool can work from it.