Skip to content
Solved Assignments

BMDS 3371 Final Exam Spring 2015

A final exam for the BMDS 3371 course, assessing the knowledge and skills acquired during the semester.

Preview 2 of 6 pages

See the first 2 pages exactly as they appear in the document.

  1. Page 1
    Read page 1 as text

    BMDS 3371 Final Exam Spring 2015 Report this Question as Inappropriate Question1. Arcs in a project network indicate a. completion times. b. precedence relationships. c. activities. d. None of the alternatives above is correct. 2. Activities G, P, and R are the immediate predecessors for activity W. If the earliest finish times for the three are 12, 15, and 10, then the earliest start time for W a. is 10. b. is 12. c. is 15. d. cannot be determined. 3. When activity times are uncertain, a. assume they are normally distributed. b. calculate the expected time, using (a + 4m + b) /6. c. use the most likely time. d. calculate the expected time, using (a + m + b)/3. 4. Slack equals a. LF ? EF. b. EF ? LF. c. EF ? LS. d. LF ? ES. 5. Activities with zero slack a. can be delayed. b. must be completed first. c. lie on a critical path. d. have no predecessors. 6. Inventory a. is held against uncertain usage so that a supply of items is available if needed. b. constitutes a small part of the cost of doing business. c. is not something that can be managed effectively. d. All of the alternati ves are correct. 7. Inventory models in which the rate of demand is constant are called a. fixed models. b. deterministic models. c. JIT models. d. requirements models. 8. Safety stock a. can be determined by the EOQ formula.

  2. Page 2

4 more pages in the full document

Unlock it once and it stays in your library, ready to chat with or turn into flashcards.

Unlock the full document
See all

Study this document with CramX

Once it is in your library, every tool can work from it.