QQuestionCivil Engineering
QuestionCivil Engineering
"What is the term for soil removed from an excavation?
A. Waste
B. Fines
C. Tailings
D. Spoils"
11 months agoReport content
Answer
Full Solution Locked
Sign in to view the complete step-by-step solution and unlock all study resources.
Step 1:I'll solve this problem step by step:
Step 2:: Understand the terminology
In construction and excavation terminology, the material removed during digging or excavation has a specific technical term.
Step 3:: Analyze the given options
Let's examine each option: - Waste: A general term for discarded materials - Fines: Refers to very small particles in soil or aggregate - Tailings: Typically used in mining for leftover materials after processing - Spoils: The specific term for earth or rock removed during excavation
Step 4:: Identify the correct term
The term "spoils" specifically refers to the soil, rock, or other material removed during excavation, earthmoving, or mining operations.
Final Answer
Spoils Explanation: In construction and engineering, "spoils" is the technical term used to describe the material excavated from a site during digging, trenching, or other earth-moving activities. This term is commonly used in civil engineering, construction, and geological contexts to describe the displaced earth or rock material from an excavation site.
Need Help with Homework?
Stuck on a difficult problem? We've got you covered:
- Post your question or upload an image
- Get instant step-by-step solutions
- Learn from our AI and community of students