    1 Energy barriers and remedies - India Energy barriers and remedies - India Discuss the energy policy changes observed globally and the situation of energy resources in India, focusing on barriers to renewable energy adoption. How has the Indian government responded to these barriers, and what measures have been taken to improve energy efficiency and reduce energy shortages? (Word Count: 1200 - 1500 words)

  2. Page 2
  3. Page 3
    Read page 3 as text

    2 Energy barriers and remedies - India Introduction The energy policy changes are observed during the globe in around in 1990. Energy regulations began to be started due to economic, security, environmental and security concern prevalent in the country. The policy changes started in the fields of renewable energy, which contains the incentives and reducing the barriers in this sector. These policies include energy promotion policies; transport bio fuels policies, emission reduction policies, distributed generation policies, electric power restructuring policies and rural electrification policies. Situation of India Crude Oil - The oil consumption of India is 3.182 million bbl/day ( 2010) . The demand of oil is around 207 million tonnes in 2011 - 12. The domestic production in 2011 - 12 is only 39 - 40 million tonnes (all the tables are taken from planning commission). It can be found at also http://www.spartastrategy.com/blog/2011/07/indias - energy - demand - and - supply - deficit 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11 2011 - 12 ONGC - 27.16 28.00 29.00 28.53 27.37 OIL - 3.50 3.55 3.73 3.91 4.30 Private/JV - 10.57 10.78 9.76 8.75 7.85 Total 33.98 41.23 42.33 42.49 41.19 39.51 Crude Oil Production – Eleventh Five - Year Plan Projections (Million tonnes) Liquid natural gas Supply - – Eleventh Plan Period , Projected Natural Gas Demand (mms / cmd) 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11 2011 - 12 Dahej 5.00 5.00 5.00 7.50 10.00 10.00 Hazira 2.50 2.50 2.50 2.50 2.50 2.50 Dabhol - 1.20 2.10 5.00 5.00 5.00 Kochi - - - - 2.50 5.00 Mangalore - - - - - 1.25 Total 7.50 8.70 9.60 15.00 20.00 23.75 Production - Eleventh Five - Year Plan Projection Gas Production (bcm) 2006 - 07 2007 - 08 2008 - 09 2009 - 10 2010 - 11 2011 - 12 ONGC - 22.10 22.53 22.77 22.99 22.00 OIL - 3.13 3.21 3.25 3.28 3.56 Private/JV - 8.55 22.55 29.41 28.77 37.61

6 more pages in the full document

Unlock it once and it stays in your library, ready to chat with or turn into flashcards.

Unlock the full document
See all

Study this document with CramX

Once it is in your library, every tool can work from it.