Skip to content
Solved Assignments

BSA 400 Riordan: Development of an ERP System Final Report

Final report on the ERP system development for Riordan Manufacturing.

Preview 13 of 40 pages

See the first 13 pages exactly as they appear in the document.

  1. Page 1
    Read page 1 as text

    Riordan: Development of an ERP System Final Report BSA 400 Riordan Manufacturing is considering the implementation of an ERP system to improve inventory management and optimize its production processes. Based on the provided case study, explain how the ERP system will address key challenges in inventory control, material procurement, and overall operational efficiency. Discuss the anticipated benefits, cost savings, and improvements in accuracy and supply chain management. Your response should be between 600 - 800 words."

  2. Page 2
  3. Page 3
    Read page 3 as text

    Enterprise Resource Planning System Statement of Scope and Goals Riordan Manufacturing, a fortune 1000 organization was established by Dr. Riordan, a lecturer of chemistry, having a number of patents related to processing polymers into higher tensile strength plastic material substrates. Realizing the industrial uses for his patents, Dr. Riordan established Riordan Plastics, Inc. during 1991. The organization has their company office in San Jose, CA having 125 workers, a plastic beverage bottle factory in Albany, GA having 45 workers, a customized plastic parts factory in Pontiac, MI having 130 workers, and a plastic fan factory in China having 250 workers. All those offices and or factories place their info on a variety of computer systems. Riordan Manufacturing presently has a legacy MRP Information System set up. The assessment will offer info for the organization in order to update its system. The update of the system will take into consideration the following: Cost Constraints Risk

  4. Page 4
    Read page 4 as text

    Benefits Riordan Manufacturing would wish to have an assessment for the development of an ERP system to monitor and control raw materials and a finished product stock throughout all factories. Depending on the assessment, Riordan will increase their production by using a latest ERP both for the clients and the organization. Riordan will perform the following: Up date their system to monitor stock correctly and control raw materials and finished products. Decrease stock cost of raw materials and finished products. Improve MRP infrastructure. Supporting Measures for Success The execution of an ERP for Riordan Manufacturing will let a full understanding of the day to day functions throughout all of its factories, and a reliable purchase and use of raw materials to assist optimize savings over the life cycle of its products.

  5. Page 5
    Read page 5 as text

    Being a leader in the industry in the plastic injection molding Riordan Manufacturing must be in charge of those areas in which purchasing raw materials and manufacturing of items seem sensible to its company procedure. The execution of an ERP will let Riordan Manufacturing to have understanding of the industries for which it produces items and for that reason keep stock to fulfill the requirements of its customers. Just like all production industries Riordan Manufacturing is impacted by economical prediction of the industries that it acts, however this understanding alone doesn't offer adequate understanding to know exactly how internal sections react to economical changes. The effective execution of ERP will produce palpable savings through purchase of materials to fulfill the requirement of the beverage, army, automobile, and healthcare sectors, and the way the information gathered with each item order is an easy procedure used over all of the sections. Presently Riordan Manufacturing holds an inventory worth 3,727,922.40 to fulfill orders for its clientele nevertheless; this stock of parts requirements store real state, specific warehouse equipment, and time for handling and audit across several computers systems over the organization. But with the execution of an ERP system there will be an accountable purchase of materials in line with the info supplied by demand and supply strategies which will consequently provide adequate information to have a lower stock of raw materials and finished products, yet still be a responsible partner mindful of the customers’ requirements

  6. Page 6
    Read page 6 as text

    Requirement Analysis Project Feasibility Study Team B will show that it's technically feasible and economically beneficial for Riordan to employ the latest ERP System which meets the objectives which have been established for the organization. Carrier expenses would be decreased by roughly 35% of present expenditures by the usage of a far more integrated delivery method that may direct and combine deliveries automatically to enable them to be delivered to typical addresses in shared packaging. While main carrier would off discounts when Riordan linked into their invoicing system, the ERP system would help this, which would be an additional cost savings of 15 %. Shortages of supplies from vendors are also expected to be decreased and improved by 5% in the beginning and increasing to 20% during 2 years, because of the removal of hand written Purchase Orders and the automatic Cycle Count abilities and reviews. Improvements to stock precision are also expected to be decreased and improved through similar numbers because normal cycle counts progressively correct stock balances, and also the utilization of digital bar code methods and marking to assist avoid wrong counting of piece parts. Proposed Systems Requirements

  7. Page 7
    Read page 7 as text

    Riordan Manufacturing’s uniformity of activities and quality control rely on methods that need assessment to better monitor and handle raw materials and stock of deliverable materials. Execution of an Enterprise Requirements Planning (ERP) system will have the consequence of integration of existing Information Systems to satisfy company needs at all of Riordan’s production sites. A high - level performance for the benefits of a advanced ERP system which will provide improvement in Riordan company procedures are divided into 9 stages fulfilling the scope of the suggested venture and explain the range of activities to successfully develop the ERP system. High - level overviews of the related project needs consist of (Motiwalla & Thompson, 2009, p. 63): Procurement : Purchasing is the procedure in which suppliers provide goods for operating companies. This procedure will include supplier showing, quotes, assessment and lastly choice. Purchasing will likewise incorporate allotment of organization owned devices e.g. laptop computers to its workers. It will maintain check of organization property and cope with damages. Production: Output analyzes needs using Riordan company system evaluation and current legacy systems. Output will additionally make certain smooth running of procedures in live atmosphere. Accounting: Pricing of software program, computer hardware, maintenance, and labor hours. Distribution: shipping of essential software program, computer hardware, and staff (implementers and contracted supplier support) to each of Riordans production plants. Customer Services : Customer support will be an integral part of Riordan ERP. An effective ticketing service together with monitoring will be maintained in the ERP to make sure interaction with Riordan administration regarding execution status, functionality and any shortfalls experienced.

  8. Page 8
    Read page 8 as text

    Performance and Governance : Every quarter assessments of all workers will be completed to make sure favorable and competitive working conditions. Human Resources : Human Resource will consist of methods which cope with every aspect of a worker. It includes hiring, training a worker, payroll, advantages and firing. An extensive ERP execution strategy will meet Riordan’s costs, scope, and time limitations of going operational through specific time - line goals. To achieve the development and eventually execution of the ERP will need the high - level requirements mentioned above are completely exploited to identify system performance and feasibility. These types of low level functions are acquired after making consumer tales which together achieve the higher level needs. After assessment of system performance is established current company procedures will be assessed to find out customization and integration of Riordan’s legacy systems. The ERP will be a crucial part of Riordan’s capability to monitor its raw materials and stock of manufactured items. The ERP info system offers “automation to support Riordan’s this kind of company functions as accounting, finance, advertising, customer support, human resource management, and operations” (Motiwalla & Thompson, 2009, p. Determination of Requirements Team B has got the chance to find out the requirements of the workers of Riordan Manufacturing. We have decided to achieve this by following people around, group interviews, and prototyping. B y carrying out these group interviews and following people around, Riordan’s

  9. Page 9
    Read page 9 as text

    stock division is presently manually entering inventory. Riordan would benefit from an automatic scanning system which will automatically up grad e when an item is ready for stock or sold. Depending on the information we receive d, we de cided that the accounting and finance division should modify their existing financial process. In order for Riordan to get the largest bang for their money , they should be sure to execute the system nationwide. This system will let the following: Tailored reports Charges Payment posting Collections Prototype Team B will be using prototyping to find out the requirements of Riordan Manufacturing. Riordan Manufactu ring has been successful so far however it is necessary for them to execute an ERP system so they can take their company to the next higher level and continue competitive in today’s market. Riordan should know where their weak point lies so we can improve them; here the ERP system will come into play. Team B will suggest that Riordan Manufacturing use a prototype process, this will examine all the information from group interviews, and following people around. This will let to check the prototypes with the information and satisfy the

  10. Page 10
    Read page 10 as text

    stakeholder’s requirements . “This model works best in situations where not all of the project need s are known in detail ahead of time. It is an iterative, trial - and - error procedure that takes place between the developers and the users” ( "Searchcio - Midmarket , " 2007, para. 1 ). Confirmed Requirements This document shows the list of verified needs as a consequence of comments from the team’s determination of needs for ERP development. Each requirement is either compulsory or elective using info of present procedures. Additionally contained in the document is a reasonable view of the information movement external and internal to Riordan’s 4 sites. Discussion regarding the variations of the present system data movement and also the suggested ERP system shows the advantage of using the latest system. The analysis groups met up with each of Riordan’s project administrators to assess present procedures at the Albany, Pontiac, Hangzhou, and San Jose sites. Meetings included queries of present system performance, versatility, dependability, ease of use, and supplier satisfaction. Assessment of the information from Riordan customers, practical proprietors, and information systems managers is the foundation for arranging and assessing Riordan’s company requirements. The present network facilities - quantity of servers, workstations, and present software program (operating system and programs) has been ideal for dealing with the production and delivery of Riordan’s raw materials. Comprehensive research into the company’s resources and capabilities is important for personalization of an ERP program to migrate Riordan’s present info.

  11. Page 11
    Read page 11 as text

    It's with confidence that the improvement or purchase of a good ERP system as a consequence of the determination of needs will make monitoring and maintaining raw materials for Riordan sites more effective. Purpose Integration of present info existing on systems found in Albany, Pontiac, Hangzhou, and San Jose company head office having the improvement or purchase of an Enterprise Resource Planning system. Scope A listing of verified needs depending on comments from Riordan functional administrators, input from stake holders, GAP assessment of present system performance and possible ERP performance, and overview of determination of needs outlined in the request for proposal and preliminary evaluation. Riordan’s board of directors is accountable for the company’s operation according to state requirements, Articles of Incorporation, and by - laws. Therefore the board offers the oversight of quality control and controls the path of the venture with the investors’ best interests. Coordination with Riordan’s management will help the analysis and answer to make sure info obtained is correct.

  12. Page 12
    Read page 12 as text

    Assessment of Riordan’s present network facilities with regards to combining an ERP system for business wide use it was essential to classify needs taking into consideration appropriateness of Riordan’s use, system characteristics, and advantages. Six factors in narrowing the determination of needs right down to an appropriate listing are displayed in table 1.1 Enterprise Resource Planning Requirements Considerations Item Description Mandatory/Optional Functionality ERP characteristics meet the requirements of the client Obligatory On - site Options Present software program offers choices for SaaS through Web interface. Elective Configuration Flexible to personalization to satisfy particular requirements of Riordan. Obligatory Implementation Strategy Availability of educated experts to apply data migration and assistance making certain congruency of all Obligatory

  13. Page 13
    Read page 13 as text

    Riordan sites. Evaluation of Components Assessment and coordination of present systems for probable changes, e.g., computer hardware updates or software program purchase. Obligatory Data Migration Moving present info; Code change for unlike data formats. Obligatory Table 1.1 – ERP Requirements Considerations Method The data utilized in compiling this document was accumulated by surveys which outlined the listing of needs on a weighted scale of 1.00 to 5.00. Surveys were made readily available for 550 workers; 400 from the 550 surveys were returned.

27 more pages in the full document

Unlock it once and it stays in your library, ready to chat with or turn into flashcards.

Unlock the full document
See all

Study this document with CramX

Once it is in your library, every tool can work from it.