Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 1 True / False 1. Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries. a. True b. False ANSWER: True RATIONALE: Feedback: Until the 1980s, project management primarily focused on providing schedule and resource data to top management in the military, computer, and construction industries. Today’s project management involves much more, and people in every industry and every country manage projects. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.2 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.1 - LO: 1 - 1 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: Introduction KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 2. A difference between operations and projects is that operations end when their objectives have been reached, whereas projects do not. a. True b. False ANSWER: False RATIONALE: Feedback: Projects are different from operations in that they end when their objectives have been reached or the project has been terminated. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.4 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 3. Every project should have a well - defined objective. a. True b. False
Page 2 Page 3 Read page 3 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 2 ANSWER: True RATIONALE: Feedback: A project has a unique purpose. Every project should have a well - defined objective. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.6 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 4. Projects should be developed in increments. a. True b. False ANSWER: True RATIONALE: Feedback: A project is developed using progressive elaboration. Projects are often defined broadly when they begin, and as time passes, the specific details of the project become clearer. Therefore, projects should be developed in increments. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.6 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 5. A project manager’s primary role is to provide the funding for a project. a. True b. False ANSWER: False RATIONALE: Feedback: A project sponsor usually provides the direction and funding for a project. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.7 QUESTION TYPE: True / False HAS VARIABLES: False
Page 4 Read page 4 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 3 LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 6. One of the main reasons why project management is challenging is because of the factor of uncertainty. a. True b. False ANSWER: True RATIONALE: Feedback: A project involves uncertainty. Every project is unique and thus it is sometimes difficult to define its objectives clearly, estimate how long it will take to complete, or determine how much it will cost. This uncertainty is one of the main reasons project management is so challenging. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.7 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 7. Questions about how a team will track schedule performance is related to a project’s scope. a. True b. False ANSWER: False RATIONALE: Feedback: Project scope deals with questions such as, “What work will be done as part of the project?”, “What unique product, service, or result does the customer or sponsor expect from the project?”, or “How will the scope be verified?” POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.7 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM
Page 5 Read page 5 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 4 DATE MODIFIED: 4/27/2018 2:53 PM 8. In order to be realistic, a project manager should always set discrete goals instead of a range of objectives. a. True b. False ANSWER: False RATIONALE: Feedback: Because projects involve uncertainty and limited resources, projects rarely finish according to their original scope, time, and cost goals. Instead of discrete target goals, it is often more realistic to set a range of goals. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.8 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/4/2018 7:42 PM 9. Managing the triple constraint primarily involves making trade - offs between resources and quality. a. True b. False ANSWER: False RATIONALE: Feedback: Managing the triple constraint involves making trade - offs between scope, time, and cost goals for a project. Experienced project managers know that one must decide which aspect of the triple constraint is most important. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.8 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 10. The only responsibility of a project manager is to meet the specific scope, time, and cost goals of a project. a. True b. False ANSWER: False RATIONALE: Feedback: Project managers must strive not only to meet specific scope, time, cost, and
Page 6 Read page 6 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 5 quality goals of projects but also facilitate the entire process to meet the needs and expectations of people involved in project activities or affected by them. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.9 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is Project Management? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 11. A project’s stakeholders include its customers, users, and suppliers. a. True b. False ANSWER: True RATIONALE: Feedback: Stakeholders are the people involved in or affected by project activities, and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents of a project. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.9 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/8/2018 10:41 AM 12. Opponents of a project do not belong to the category of stakeholders. a. True b. False ANSWER: False RATIONALE: Feedback: Stakeholders are the people involved in or affected by project activities, and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents of a project. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.9 QUESTION TYPE: True / False
Page 7 Read page 7 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 6 HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is Project Management? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 13. The importance of stakeholders’ needs and expectations is limited to the beginning of a project. a. True b. False ANSWER: False RATIONALE: Feedback: Stakeholders’ needs and expectations are important in the beginning and throughout the life of a project. Successful project managers develop good relationships with project stakeholders to understand and meet their needs and expectations. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.11 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is Project Management? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 14. Project procurement management primarily involves identifying stakeholder needs while managing their engagement throughout the life of the project. a. True b. False ANSWER: False RATIONALE: Feedback: Project management knowledge areas describe the key competencies that project managers must develop. Project procurement management involves acquiring or procuring goods and services for a project from outside the performing organization. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.12 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge
Page 8 Read page 8 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 7 DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 15. The primary role of project stakeholder management is to ensure that the project will satisfy the stated needs for which it was undertaken. a. True b. False ANSWER: False RATIONALE: Feedback: Project management knowledge areas describe the key competencies that project managers must develop. Project stakeholder management includes identifying and analyzing stakeholder needs while managing and controlling their engagement throughout the life of the project. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.12 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 16. Project resource management is concerned with making effective use of the people involved with a project. a. True b. False ANSWER: True RATIONALE: Feedback: Project management knowledge areas describe the key competencies that project managers must develop. Project resource management is concerned with making effective use of the people and physical resources involved with the project. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.11 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/4/2018 7:54 PM 17. Stakeholder analyses, work requests, and project charters are tools used in integration management. a. True
Page 9 Read page 9 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 8 b. False ANSWER: True RATIONALE: Feedback: Project selection methods, project management methodologies, stakeholder analyses, work requests, and project charters are some of the tools used in integration management. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.13 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 18. Earned value management is a tool primarily used in resource management. a. True b. False ANSWER: False RATIONALE: Feedback: Project budgets, net present value, return on investment, payback analysis, and earned value management are tools used in cost management. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.14 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/4/2018 7:56 PM 19. Responsibility assignment matrices and project organizational charts are examples of tools used in procurement management. a. True b. False ANSWER: False RATIONALE: Feedback: Motivation techniques, empathic listening, responsibility assignment matrices, project organizational charts, resource histograms and team building exercises are tools used in resource management. POINTS: 1 DIFFICULTY: Difficulty: Easy
Page 10 Read page 10 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 9 REFERENCES: p.14 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/4/2018 8:05 PM 20. Maturity models, statistical methods, and test plans are examples of tools used in quality management. a. True b. False ANSWER: True RATIONALE: Feedback: Quality metrics, maturity models, statistical methods, and test plans are some of the tools used in quality management. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.13 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 21. Project managers work with the project sponsors to define success for particular projects. a. True b. False ANSWER: True RATIONALE: Feedback: Project managers work with the project sponsors, the project team, and other stakeholders to meet project goals. They also work with sponsors to define success for particular projects. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.18 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is Project Management? KEYWORDS: Bloom's: Knowledge
Page 11 Read page 11 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 10 DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 22. Good project managers assume that their definition of success is the same as the sponsors. a. True b. False ANSWER: False RATIONALE: Feedback: Good project managers do not assume that their definition of success is the same as the sponsors. They take the time to understand their sponsors’ expectations and then track project performance based on important success criteria. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.18 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is Project Management? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 23. Program managers are change agents. a. True b. False ANSWER: True RATIONALE: Feedback: Program managers are responsible for more than the delivery of project results. They are change agents responsible for the success of products and processes developed by these projects. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.19 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.4 - LO: 1 - 4 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: Program and Project Portfolio Management KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/4/2018 8:10 PM 24. Effective program managers recognize that managing a project is much more complex than managing a program. a. True b. False ANSWER: False
Page 12 Read page 12 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 11 RATIONALE: Feedback: Effective program managers recognize that managing a program is much more complex than managing a single project. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.19 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.4 - LO: 1 - 4 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: Program and Project Portfolio Management KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 25. Individual projects always address strategic goals whereas portfolio management addresses tactical goals. a. True b. False ANSWER: False RATIONALE: Feedback: Tactical goals are generally more specific and short - term than strategic goals, which emphasize long - term goals for an organization. Individual projects often address tactical goals, whereas portfolio management addresses strategic goals. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.19 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.4 - LO: 1 - 4 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: Program and Project Portfolio Management KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 26. It is mandatory for project managers working on large information technology projects to be experts in the field of information technology. a. True b. False ANSWER: False RATIONALE: Feedback: Project managers for large IT projects do not have to be experts in the field of IT, but they must have working knowledge of various technologies and understand how the project would enhance the business. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.27 QUESTION TYPE: True / False
Page 13 Read page 13 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 12 HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.5 - LO:1 - 5 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: The Role of the Project Manager KEYWORDS: Bloom's : Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 27. To be a successful manager, the only skills an IT project manager needs to possess are excellent technical skills. a. True b. False ANSWER: False RATIONALE: Feedback: IT project managers must be willing to develop more than their technical skills to be productive team members and successful project managers. Everyone, no matter how technical they are, should develop business and soft skills. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.27 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.5 - LO:1 - 5 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: The Role of the Project Manager KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/8/2018 10:42 AM 28. The introduction of new software makes basic tools, such as Gantt charts and network diagrams, inexpensive and easy to create. a. True b. False ANSWER: True RATIONALE: Feedback: As computer hardware became smaller and more affordable and software companies developed graphical, easy - to - use interfaces, project management software became less expensive and more widely used. New software makes basic tools such as Gantt charts and network diagrams inexpensive, easy to create, and available for anyone to update. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.32 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.6 - LO: 1 - 6 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: The Project Management Profession KEYWORDS: Bloom's: Knowledge
Page 14 Read page 14 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 13 DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 29. The enterprise project management software, which aids project and portfolio management, is a low - end tool. a. True b. False ANSWER: False RATIONALE: Feedback: A category of project management software is high - end tools, sometimes referred to as enterprise project management software. These tools provide robust capabilities to handle very large projects and dispersed workgroups. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.38 p.39 QUESTION TYPE: True / False HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.6 - LO: 1 - 6 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: The Project Management Profession KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM Multiple Choice 30. Which characteristic highlights a difference between projects and operations? a. Projects are undertaken to sustain an organization’s business whereas operations are not. b. Operations are undertaken to create unique products, services, or results whereas projects are not. c. Projects are temporary endeavors whereas an organization’s operations are ongoing in nature. d. Operations have well - defined objectives whereas projects do not need to have a unique purpose. ANSWER: c RATIONALE: Feedback: A project is “a temporary endeavor undertaken to create a unique product, service, or result.” Operations, on the other hand, is work done in organizations to sustain the business. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.4 QUESTION TYPE: Multiple Choice HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/13/2018 12:30 PM
Page 15 Read page 15 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 14 31. Which objective is true of projects? a. They have an indefinite beginning and end. b. They have a unique purpose. c. They are developed using regressive elaboration. d. They are permanent in nature. ANSWER: b RATIONALE: Feedback: One of the attributes of projects is that they has have a unique purpose. Every project should have a well - defined objective. POINTS: 1 DIFFICULTY: Difficulty: Moderate REFERENCES: p.6 QUESTION TYPE: Multiple Choice HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: Analytic TOPICS: What is a Project? KEYWORDS: Bloom's: Comprehension DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/7/2018 6:38 PM 32. The role of a _____ is to provide direction and funding for a project. a. project sponsor b. project manager c. support staff member d. project team ANSWER: a RATIONALE: Feedback: Most projects have many interested parties or stakeholders, but someone must take the primary role of sponsorship. The project sponsor usually provides the direction and funding for the project. POINTS: 1 DIFFICULTY: Difficulty: Easy REFERENCES: p.7 QUESTION TYPE: Multiple Choice HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: - Comprehension TOPICS: What is a Project? KEYWORDS: Bloom's: Knowledge DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 33. Galaxy, a construction company, buys a particular brand of tiles manufactured by Tiles and Floors, an eco - friendly tile manufacturing company. However, Tiles and Floors has declared bankruptcy and closed down. At present, Galaxy is facing a crisis because there are no other manufacturers in the market that supplies eco - friendly tiles. Which constraint is Galaxy currently facing? a. Resources b. Time
Page 16 Read page 16 as text
Chapter 1 - Introduction to Project Management Copyright Cengage Learning. Powered by Cognero. Page 15 c. Scope d. Cost ANSWER: a RATIONALE: Feedback: Every project is constrained in different ways. For some projects, resources are the main concern. POINTS: 1 DIFFICULTY: Difficulty: Challenging REFERENCES: p.9 QUESTION TYPE: Multiple Choice HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.2 - LO: 1 - 2 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: What is a Project? KEYWORDS: Bloom's: Application DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 5/8/2018 10:43 AM 34. Steve, an engineer in a construction company, is at present working on a home construction project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is _____. a. Steve b. the support staff c. the project team d. the Robinson family ANSWER: d RATIONALE: Feedback: Stakeholders are the people involved in or affected by project activities, and include the project sponsor, project team, support staff, customers, among others. In a home construction project, the project sponsors would be the potential new homeowners. POINTS: 1 DIFFICULTY: Difficulty: Challenging REFERENCES: p.9 QUESTION TYPE: Multiple Choice HAS VARIABLES: False LEARNING OBJECTIVES: INFO.SCHW.14.3 - LO: 1 - 3 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: What is Project Management? KEYWORDS: Bloom's: Application DATE CREATED: 4/27/2018 2:53 PM DATE MODIFIED: 4/27/2018 2:53 PM 35. Which knowledge area involves defining and managing all the work required to complete the project successfully? a. Project resource management b. Project scope management c. Project time management d. Project cost management ANSWER: b RATIONALE: Feedback: Project management knowledge areas describe the key competencies that project managers must develop. Project scope management involves defining and managing all the work required to complete the project successfully. POINTS: 1
442 more pages in the full document
Unlock it once and it stays in your library, ready to chat with or turn into flashcards.
Unlock the full documentMore Information Technology study materials
See all
Exam GuidesTest Bank for Managing and Using Information Systems: A Strategic Approach, 7th Edition (Chapters 1-13)
Information Technology
452 pages149downloadsFeb 2025
Exam GuidesTest Bank for Essentials of MIS, 12th Edition
Information Technology
342 pages146downloadsFeb 2025
Exam GuidesA+ Guide to Hardware, 9th Edition Test Bank
Information Technology
116 pages142downloadsFeb 2025
Textbook GuidesSolution Manual for Essentials of System Analysis and Design, 4th Edition
Information Technology
282 pages140downloadsFeb 2025
Textbook GuidesGuide To Networking Essentials, 7th Edition Solution Manual
Information Technology
48 pages139downloadsFeb 2025
Past Exams2023-2024 SOPHOS FIREWALL V19.5 Practice Exam with Answers (75 Solved Questions)
Information Technology
7 pages134downloadsFeb 2025
Class NotesLecture Notes for CCNP Enterprise: Core Networking (ENCOR) v8 Lab Manual, 2nd Edition
Information Technology
1089 pages123downloadsFeb 2025
Class NotesLecture Notes for Adobe XD Classroom in a Book (2020 release)
Information Technology
66 pages118downloadsFeb 2025
Study this document with CramX
Once it is in your library, every tool can work from it.