Project Plan Web - based Student Registration System Submitted To : Professor Name Submitted By : Student Name
Page 2 Read page 2 as text
Introduction The Web - based student registration system consists of several tasks : This system allows students to register for classes authenticate their credentials, select classes for which they are eligible to register, registers the students, prints a confirmation receipt, and prepares a registration invoice .
Page 3 Read page 3 as text
Work Breakdown Structure for Student Registration System In Work Breakdown Structure (WBS), the structure of the project is divided into the several components which in turn are further classified into the different activities . For Web - based student registration system, the Work Breakdown Structure divides the registration process into several separate activities which needs to be performed in the specific project . The Work Breakdown Project (WBS) for the web - based student registration system is as follows :
7 more pages in the full document
Unlock it once and it stays in your library, ready to chat with or turn into flashcards.
Unlock the full documentMore Information Technology study materials
See all
Exam GuidesTest Bank for Managing and Using Information Systems: A Strategic Approach, 7th Edition (Chapters 1-13)
Information Technology
452 pages149downloadsFeb 2025
Exam GuidesTest Bank for Essentials of MIS, 12th Edition
Information Technology
342 pages146downloadsFeb 2025
Exam GuidesA+ Guide to Hardware, 9th Edition Test Bank
Information Technology
116 pages142downloadsFeb 2025
Textbook GuidesSolution Manual for Essentials of System Analysis and Design, 4th Edition
Information Technology
282 pages140downloadsFeb 2025
Textbook GuidesGuide To Networking Essentials, 7th Edition Solution Manual
Information Technology
48 pages139downloadsFeb 2025
Past Exams2023-2024 SOPHOS FIREWALL V19.5 Practice Exam with Answers (75 Solved Questions)
Information Technology
7 pages134downloadsFeb 2025
Class NotesLecture Notes for CCNP Enterprise: Core Networking (ENCOR) v8 Lab Manual, 2nd Edition
Information Technology
1089 pages123downloadsFeb 2025
Class NotesLecture Notes for Adobe XD Classroom in a Book (2020 release)
Information Technology
66 pages118downloadsFeb 2025
Study this document with CramX
Once it is in your library, every tool can work from it.