ITEC 640 Information Technology Project Management Final Examination
- Operations Management
- Franklin University
- 5 pages
- Shared May 2025
This document contains the final examination questions for the ITEC 640 course on Information Technology Project Management.
Preview 2 of 5 pages
See the first 2 pages exactly as they appear in the document.
Page 1 Read page 1 as text
GRADUATE SCHOOL OF MANAGEMENT & TECHNOLOGY ITEC 640 Information Technology Project Management Final Examinatio n correct answer key Spring 2015 A. True/False/Fill - in - the - blanks (3 point each). 1. How is a successful project defined in the CHAOS study? ________________ _ _T /F __ Upon completion of technical planning for any project, the next most important stage is forecasting of the associated budgets 2. How does WBS map to DDT and DSC? The Work Breakdown Structure WBS is the bridge between project scope and the project plan. Activity definition and activity sequencing are part of the WBS. WBS means divide project into small components and more manageable units called "packages". These packages make possible to develop project plan, schedule, budget and monitor the progress of the project.Package starts with project and then it divides into phases. Each phase has one or more deliverables. Under this deliverables there are activities to achieve this deliverable and milestone. At the end of the phase, there is a milestone called phase completion. Milestones provides lots of advantages like 1. Keep project teams focus - It is easy to concentrate series of small short term deliverables than one single large deliverable. 2. Reduce the risk of the project - This provides opportunity to see the progress of the project. And also milestones act like proof for the concepts. 3. Provide mechanism for quality control. Developing a WBS requires several versions until everyone is comfortable and confidant that all of the work activities have been included. The process of developing WBS starts with DDT and DSC. Each deliverable in the DSC must divide into lower level details. WBS must 1. Deliverable oriented - That should not be just sequence of events. It must produce something.
Page 2
3 more pages in the full document
Unlock it once and it stays in your library, ready to chat with or turn into flashcards.
Unlock the full documentMore Operations Management study materials
See all
Textbook GuidesSolution Manual for Operations and Supply Chain Management, 14th Edition
Operations Management
342 pages133downloadsFeb 2025
Textbook GuidesManaging Quality: Integrating the Supply Chain, 6th Edition Solution Manual
Operations Management
262 pages115downloadsFeb 2025
Textbook GuidesOperations Management, (Mcgraw-hill Education Operations and Decision Sciences) 1st Edition Solution Manual
Operations Management
153 pages91downloadsFeb 2025
Textbook GuidesSolution Manual For Matching Supply with Demand: An Introduction to Operations Management, 4th Edition
Operations Management
76 pages36downloadsFeb 2025
Exam GuidesOperations Management, 5th Canadian Edition Test Bank
Operations Management
1208 pagesMay 2025
Class NotesLT DQ Bottleneck Exercise Process Map
Operations Management
1 pageMay 2025
Textbook GuidesSolution Manual for Introduction to Materials Management, 8th Edition
Operations Management
44 pagesMay 2025
Solved AssignmentsAnalysis of Economic Order Quantity (EOQ) and Production Order Quantity (POQ) Models for Inventory Management
Operations Management
4 pagesMay 2025
Study this document with CramX
Once it is in your library, every tool can work from it.